• Market Cap: $3,165,528,229,984.92
  • 24h Vol: $110,483,158,425.33
  • BTC Dominance: 57.57%
XBT.Market
Advertisement
  • Home
  • Coins MarketCap
  • Crypto Exchanges
  • Crypto Calculator
  • Top Gainers and Loser
  • News
  • Contact Us
No Result
View All Result
XBT.Market
No Result
View All Result
Home Bitcoin

Solana Critical Path: Why The Next Solana Moves Demand Attention

Jon Hartney by Jon Hartney
October 19, 2023
in Bitcoin, Blockchain, Business, Market
0
Solana Critical Path: Why The Next Solana Moves Demand Attention
189
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Solana (SOL) has been navigating a challenging correction phase for approximately two months, during which its fortunes have ebbed and flowed. The most recent dip, occurring on Aug. 15, was a direct response to a sudden decline in the price of Bitcoin, sending shockwaves throughout the crypto market. However, a closer examination of Solana’s price chart reveals an emerging inverse head and shoulders pattern.

For those unfamiliar with the inverse head and shoulders pattern, it is a technical chart formation that signals a potential trend reversal. It consists of three key components: a lower low (the head) with two higher lows on either side (the shoulders), forming an inverted “T” shape. This pattern typically signifies a shift from a bearish trend to a bullish one, making it an enticing prospect for investors.

Related articles

Only KYC can stop insider trading on prediction markets, Messari says

January 20, 2026

Bitcoin shows signs of ‘potential rally ahead’ as $90K becomes key

January 20, 2026

Solana appears to be sketching out this intriguing configuration, hinting at the possibility of a significant upswing in its price. However, the realization of this bullish scenario hinges significantly on SOL’s ability to breach a crucial resistance point known as the neckline.

Solana’s Potential Trajectory

As of the latest data available on CoinGecko, Solana (SOL) is currently trading at $23.79. Over the past 24 hours, the cryptocurrency experienced a slight dip of 0.6%, while it boasted a seven-day rally of 9.9%. These fluctuations reflect the ongoing battle between buyers and sellers, each vying for control of SOL’s price trajectory.

SOL: From Support To Vulnerability

Solana has come a long way from its support level at $22.38, offering sellers an opportunity to exert pressure on the cryptocurrency. If the selling pressure persists, price predictions indicate that SOL could drop another 12%, potentially reaching a price of $18.8. The market’s vulnerability underscores the need for a cautious approach, both for existing investors and potential buyers.

A closer examination of the daily timeframe chart reveals a distinct downward trend characterizing the ongoing correction phase of the cryptocurrency. Sellers are likely to continue exploiting any resistance points during bullish bounces, making it essential for investors to exercise caution.

As the market continues on its downward trajectory, potential buyers are advised to exercise patience. The best strategy might be to wait until the neckline resistance is breached, signaling a change in trend. Timing remains paramount, and investors should be prepared to act when the conditions are right.

Solana’s journey through the correction phase has been a rollercoaster ride for investors. In the midst of ongoing market fluctuations, staying informed and cautious is essential for both existing and potential investors in SOL.

(This site’s content should not be construed as investment advice. Investing involves risk. When you invest, your capital is subject to risk).

Featured image from PYMNTS

Read Entire Article
Tags: CryptocurrencyInvestmentMining BitcoinNewsBTC
Share76Tweet47

Related Posts

Only KYC can stop insider trading on prediction markets, Messari says

by Jon Hartney
January 20, 2026
0

Insider trading is hard to curb on non-KYC prediction markets, but even identity checks do not fully eliminate abuse, according...

Bitcoin shows signs of ‘potential rally ahead’ as $90K becomes key

by Jon Hartney
January 20, 2026
0

Bitcoin bulls defend $90,000 as Hash Ribbons and Fear and Greed Index flash buy signals, hinting at a potential rally...

Hong Kong group warns crypto licensing rollout risks forced shutdowns

by Jon Hartney
January 20, 2026
0

The warning came as Hong Kong consults on new virtual asset advisory and management licenses, expanding oversight beyond crypto trading...

Bitcoin Shows Signs Of Internal Strength As Analysts Turn More Optimistic

Bitcoin Shows Signs Of Internal Strength As Analysts Turn More Optimistic

by Jon Hartney
January 20, 2026
0

Bitcoin has shown early signs of calm, but the mood is fragile Prices pulled back from a weekend peak and...

Bitcoin price targets extend down to $58K as BTC prints new death cross

by Jon Hartney
January 20, 2026
0

Bitcoin failed to break out from its macro trading range, according to analysis, with new BTC price targets including a...

Load More
  • Trending
  • Comments
  • Latest
SUI Price Hits All-Time High – But Questions About Valuation Remain

SUI Price Hits All-Time High – But Questions About Valuation Remain

October 17, 2024
Dogecoin Holder Base Falls To 6-Month Low, But Analyst Believes DOGE Price Is Headed To $10

Dogecoin Holder Base Falls To 6-Month Low, But Analyst Believes DOGE Price Is Headed To $10

October 17, 2024
Solana Targets $160 Resistance As TVL Hits New Yearly Highs

Solana Targets $160 Resistance As TVL Hits New Yearly Highs

October 17, 2024
Bitcoin Price Holds Firm: Can It Power Toward New Gains?

Bitcoin Price Holds Firm: Can It Power Toward New Gains?

October 17, 2024
All aboard! Elon Musk’s Vegas Loop now taking Dogecoin payments

All aboard! Elon Musk’s Vegas Loop now taking Dogecoin payments

0
Crypto owners banned from working on US Government crypto policies

Crypto owners banned from working on US Government crypto policies

0
Korean startup Uprise lost $20M shorting LUNC

Korean startup Uprise lost $20M shorting LUNC

0
Ethereum testnet Merge mostly successful — ‘Hiccups will not delay the Merge.’

Ethereum testnet Merge mostly successful — ‘Hiccups will not delay the Merge.’

0

Only KYC can stop insider trading on prediction markets, Messari says

January 20, 2026

Bitcoin shows signs of ‘potential rally ahead’ as $90K becomes key

January 20, 2026

Hong Kong group warns crypto licensing rollout risks forced shutdowns

January 20, 2026
Bitcoin Shows Signs Of Internal Strength As Analysts Turn More Optimistic

Bitcoin Shows Signs Of Internal Strength As Analysts Turn More Optimistic

January 20, 2026

XBT.Market

This website is an automated news feed powered by the Nebulome cloud system. The site is made possible by YYC TECH Consulting and Alberta Digital Mining Company. As a team with major crypto and bitcoin enthusiasm, we have curated major sources of news, trading and financial data to bring you, our viewer, an unbiased source of truth.

Recent Posts

  • Only KYC can stop insider trading on prediction markets, Messari says January 20, 2026
  • Bitcoin shows signs of ‘potential rally ahead’ as $90K becomes key January 20, 2026
  • Hong Kong group warns crypto licensing rollout risks forced shutdowns January 20, 2026
  • Bitcoin Shows Signs Of Internal Strength As Analysts Turn More Optimistic January 20, 2026
  • Bitcoin price targets extend down to $58K as BTC prints new death cross January 20, 2026

News Categories

  • Bitcoin
  • Blockchain
  • Business
  • Market

Tags

bitcoinMagzine Cointelegraph Cryptocurrency insidebitcoins Investment Mining Bitcoin NewsBTC

Quicklinks

  • Home
  • Coins MarketCap
  • Crypto Exchanges
  • Crypto Calculator
  • Top Gainers and Loser
  • News
  • Contact Us

© 2022 Xbt.Market - Powered by YYC Tech Consulting & ADMCO.

No Result
View All Result
  • Home
  • Coins MarketCap
  • Crypto Exchanges
  • Crypto Calculator
  • Top Gainers and Loser
  • News
  • Contact Us

© 2022 Xbt.Market by Nebulome.

  • Steakhouse EURCV Morpho VaultSteakhouse EURCV Morpho Vault(STEAKEURCV)$0.000000-100.00%
  • FibSwap DEXFibSwap DEX(FIBO)$0.0084659.90%
  • TruFin Staked APTTruFin Staked APT(TRUAPT)$8.020.00%
  • bitcoinBitcoin(BTC)$84,372.003.58%
  • ethereumEthereum(ETH)$1,885.365.68%
  • tetherTether(USDT)$1.000.00%
  • rippleXRP(XRP)$2.186.84%
  • USDEXUSDEX(USDEX)$1.07-0.53%
  • binancecoinBNB(BNB)$617.995.03%
  • Wrapped SOLWrapped SOL(SOL)$143.66-2.32%
  • solanaSolana(SOL)$128.974.23%
  • usd-coinUSDC(USDC)$1.000.01%
  • dogecoinDogecoin(DOGE)$0.1736117.78%
  • cardanoCardano(ADA)$0.687.61%
  • tronTRON(TRX)$0.2342340.79%
  • staked-etherLido Staked Ether(STETH)$1,884.065.48%
  • Gaj FinanceGaj Finance(GAJ)$0.0059271.46%
  • Content BitcoinContent Bitcoin(CTB)$24.482.55%
  • USD OneUSD One(USD1)$1.000.11%
  • wrapped-bitcoinWrapped Bitcoin(WBTC)$84,309.003.84%
  • ToncoinToncoin(TON)$4.157.66%
  • UGOLD Inc.UGOLD Inc.(UGOLD)$3,042.460.08%
  • ParkcoinParkcoin(KPK)$1.101.76%
  • chainlinkChainlink(LINK)$14.027.76%
  • leo-tokenLEO Token(LEO)$9.211.17%
  • stellarStellar(XLM)$0.2743585.70%
  • avalanche-2Avalanche(AVAX)$19.647.71%
  • Wrapped stETHWrapped stETH(WSTETH)$2,256.395.40%
  • USDSUSDS(USDS)$1.00-0.01%
  • SuiSui(SUI)$2.429.03%
  • shiba-inuShiba Inu(SHIB)$0.0000137.71%
  • hedera-hashgraphHedera(HBAR)$0.17284810.00%
  • Yay StakeStone EtherYay StakeStone Ether(YAYSTONE)$2,671.07-2.84%
  • polkadotPolkadot(DOT)$4.257.34%
  • litecoinLitecoin(LTC)$85.265.04%
  • bitcoin-cashBitcoin Cash(BCH)$314.248.23%
  • mantra-daoMANTRA(OM)$6.301.94%
  • Pundi AIFXPundi AIFX(PUNDIAI)$16.000.00%
  • PengPeng(PENG)$0.60-13.59%
  • Bitget TokenBitget Token(BGB)$4.664.95%
  • wethWETH(WETH)$1,884.285.66%
  • Ethena USDeEthena USDe(USDE)$1.00-0.04%
  • Binance Bridged USDT (BNB Smart Chain)Binance Bridged USDT (BNB Smart Chain)(BSC-USD)$1.00-0.18%
  • MurasakiMurasaki(MURA)$4.23-13.71%
  • Black PhoenixBlack Phoenix(BPX)$3.351,000.00%
  • Pi NetworkPi Network(PI)$0.714.53%
  • HyperliquidHyperliquid(HYPE)$13.729.80%
  • Wrapped eETHWrapped eETH(WEETH)$2,003.675.53%
  • WhiteBIT CoinWhiteBIT Coin(WBT)$28.350.76%
  • moneroMonero(XMR)$217.841.31%
  • Zypto TokenZypto Token(ZYPTO)$0.037139-3.47%
  • uniswapUniswap(UNI)$6.217.66%
  • AptosAptos(APT)$5.395.79%
  • PepePepe(PEPE)$0.00000811.37%
  • daiDai(DAI)$1.00-0.01%
  • nearNEAR Protocol(NEAR)$2.635.26%
  • XT.comXT.com(XT)$3.08-1.65%
  • Layer One XLayer One X(L1X)$23.35454.66%
  • sUSDSsUSDS(SUSDS)$1.050.05%
  • okbOKB(OKB)$48.762.12%
  • gatechain-tokenGate(GT)$22.883.58%
  • crypto-com-chainCronos(CRO)$0.1015853.46%
  • Coinbase Wrapped BTCCoinbase Wrapped BTC(CBBTC)$84,342.003.68%
  • MantleMantle(MNT)$0.814.44%
  • Tokenize XchangeTokenize Xchange(TKX)$33.460.86%
  • internet-computerInternet Computer(ICP)$5.517.85%
  • ethereum-classicEthereum Classic(ETC)$17.074.81%
  • OndoOndo(ONDO)$0.817.47%
  • First Digital USDFirst Digital USD(FDUSD)$1.00-0.12%
  • aaveAave(AAVE)$168.6110.19%
  • Aerarium FiAerarium Fi(AERA)$7.14-13.11%
  • Ethena Staked USDeEthena Staked USDe(SUSDE)$1.170.30%
  • BSCEXBSCEX(BSCX)$237.310.49%
  • Official TrumpOfficial Trump(TRUMP)$10.354.36%
  • vechainVeChain(VET)$0.0233636.04%
  • cosmosCosmos Hub(ATOM)$4.538.09%
  • fantomFantom(FTM)$0.70-1.56%
  • BittensorBittensor(TAO)$231.277.72%
  • BlackRock USD Institutional Digital Liquidity FundBlackRock USD Institutional Digital Liquidity Fund(BUIDL)$1.000.00%
  • EthenaEthena(ENA)$0.3616194.37%
  • render-tokenRender(RENDER)$3.6710.91%
  • filecoinFilecoin(FIL)$2.927.72%
  • CelestiaCelestia(TIA)$3.181.75%
  • Black AgnusBlack Agnus(FTW)$0.000183423.46%
  • Lombard Staked BTCLombard Staked BTC(LBTC)$84,465.004.02%
  • POL (ex-MATIC)POL (ex-MATIC)(POL)$0.2063993.13%
  • KaspaKaspa(KAS)$0.0682239.38%
  • STAUSTAU(STAU)$0.17397910.95%
  • FasttokenFasttoken(FTN)$4.020.01%
  • Sonic (prev. FTM)Sonic (prev. FTM)(S)$0.5212.98%
  • algorandAlgorand(ALGO)$0.1896979.65%
  • ORA CoinORA Coin(ORA)$4.885.92%
  • ArbitrumArbitrum(ARB)$0.3397526.22%
  • Arbitrum Bridged USDT (Arbitrum)Arbitrum Bridged USDT (Arbitrum)(USDT)$1.000.07%
  • GGTKNGGTKN(GGTKN)$0.1121180.75%
  • kucoin-sharesKuCoin(KCS)$11.231.19%
  • Solv Protocol SolvBTCSolv Protocol SolvBTC(SOLVBTC)$84,076.003.32%
  • fetch-aiArtificial Superintelligence Alliance(FET)$0.4856098.68%
  • optimismOptimism(OP)$0.776.43%
  • StoryStory(IP)$4.75-2.68%